Basic knowledge of Civil Engineering
Basic knowledge of Civil Engineering
The following
are some basic civil engineering points for civil engineers to remember in
order to make construction work easier while maintaining construction quality:
·
The slab's minimum thickness should be 125 mm.
·
A maximum height of 1.50m is permitted for
concrete freefall.
·
Lap splices must not be used on bars larger than
36 mm in diameter.
·
The water absorption of bricks is limited to no
more than 15%.
·
The PH value of the used water should not be
less than 6.
·
Bricks have a minimum compressive strength of
3.5 N/mm2.
·
Steel reinforcement requires 8 kg of binding
wire per metric tonne.
·
For IS code soil filling work, 3 samples for
core cutting test should be taken for every 100m2.
·
Lapping in reinforcement is not permitted for
bars with diameters greater than 36 mm.
·
The maximum spacing for steel char is 1.00 m
(or) 1 No per 1m2.
·
A rod with a minimum diameter of 12 mm should be
used in steel dowels.
·
Steel chairs with a minimum bar diameter of 12
mm must be used.
·
Longitudinal reinforcement should be no less
than 0.8 percent and no more than 6% of total C/S.
·
The minimum number of bars used in a square
column is four, and the number of bars used in a circular column is six.
·
The main bars used in
the slabs must be at least 8 mm (HYSD) or 10 mm (Plain bars), and the distributors
must be at least 8 mm and no more than 1/8 of the slab thickness.
Curing Time for Concrete Members Made of Different Types of
Cement
|
Type of cement |
Time |
|
Super Sulphate cement |
7 days |
|
Ordinary Portland cement OPC |
10 days |
|
Minerals & Admixture added cement |
14 days |
Minimum Nos. Of Concrete Cube Sample for Given Volume of
Concrete
1 – 5 m3
= 1 Nos.
6 – 15 m3
= 2 Nos.
16 – 30 m3
= 3 Nos.
31 – 50 m3
= 4 Nos.
Above 50 m3
= 4 + 1 Nos.
De-Shuttering Period of Different RCC
Members
The period for
columns, walls, vertical formworks – 16-24 hrs.
Period for
Soffit formwork to slabs – 3 days (props to be refixed after removal)
The period for
Soffit to beams props – 7 days (props to be refixed after removal)
Beams spanning
up to 4.5m – 7 days
Beams spanning
over 4.5m – 14 days
Arches spanning
up to 6m – 14 days
Arches spanning
over 6m – 21 days
Density of Construction Materials
Bricks – 1600 –
1920 kg/m3
Concrete block –
1920 kg/ m3
Reinforce
Concrete – 2310 – 2700 kg/ m3
Aggregates – 2400
- 2900 kg/m3